Ferretti Construction
With over a century of experience, Ferretti Construction specializes in industrial foundation revamping, applying a proven Fast-Track approach tailored to the needs of the steel and non-ferrous sectors.
Through precise planning and seamless coordination between engineering and construction, Ferretti is able to reduce revamping time by up to 75%, drastically minimizing production shutdowns—without compromising on safety, quality, or integration with existing equipment. Latest reference of Ferretti in Germany is the completion of the foundation work at tkSE brownfield side for the new HSM #4 in Bruckhausen in 35 days.